Client: THOMAS S
Location: 21 GREIG ST, SMITH FALLS, on K7A 1M2
Duration: 3 WEEKS
Project Type: RESIDENTIAL construction
Description: THE EXISTING BATHTUB, TILE SURROUND, AND PLUMBING WAS REMOVED IN ORDER TO UPDATE THE SPACE. NEW MARBLE TILE WAS INSTALLED TO GIVE A TIMELESS LOOK, ALONG WITH THE DARK PLUMBING FINISHES TO ADD CONTRAST.
NEW TILE FLOORING was installed THROUGHOUT THE BATHROOM WITH TILE BASEBOARDS.
IN ADDITION, THE TOILET WAS UPDATED TO A MORE EFFICIENT MODEL, CABINET DOORS WERE CHANGED TO A SHAKER STYLE WITH NEW CABINET PULLS, AND THE BATHROOM EXHAUST FAN WAS RELOCATED, and replaced.