BATHROOM renovation

PROJECT DETAILS

Client: THOMAS S

Location: 21 GREIG ST, SMITH FALLS, on K7A 1M2

Duration: 3 WEEKS

Project Type: RESIDENTIAL construction

Description: THE EXISTING BATHTUB, TILE SURROUND, AND PLUMBING WAS REMOVED IN ORDER TO UPDATE THE SPACE.  NEW MARBLE TILE WAS INSTALLED TO GIVE A TIMELESS LOOK, ALONG WITH THE DARK PLUMBING FINISHES TO ADD CONTRAST. 

NEW TILE FLOORING was installed THROUGHOUT THE BATHROOM WITH TILE BASEBOARDS. 

IN ADDITION, THE TOILET WAS UPDATED TO A MORE EFFICIENT MODEL, CABINET DOORS WERE CHANGED TO A SHAKER STYLE WITH NEW CABINET PULLS, AND THE BATHROOM EXHAUST FAN WAS RELOCATED, and replaced.